KOYEE | OTHERS |
---|---|
Localized - No time waste | Overseas manufacturers for modular containers |
No Sea freight transportation risks | Sea freight required |
Made in Qatar | All materials shall be imported |
Local materials to be utilized | Unavailability of Materials in the local market |
Great Design Engineering Flexibility | Not possible once delivered to the site |
Easy installation with a forklift on site - Not affected by hot season | Flat Packs has to be erected on site by cranes |
Easy Modification | Not possible |
Easy Rectification | Not possible |
Small amount of work on site | Massive amount of work on site |
Small number of manpower on site | Large number of manpower on site |
Less Waste | Lots of waste of packing materials |
Less lifting activities | Multiple cranes required |
Roof covering the entire building - avoid risk of leaking | Rubber seals and gaskets (chance of leakage) |
Less number of foundation | Foundation every 2.4m long direction x 3m short direction |
Electrical 90% done in the workshop | 100% Installation on site (confined space) |
Plumbing 95% done in the workshop | 100% Installation on site (confined space) |
Drainage line 95% done in the workshop | 100% Installation on site (confined space) |
Corridors prefabricated in the workshop | Not possible |
The column profile has improved the section to eliminate dust accumulation and penetration inside the building. | Not possible |
Appropriate value engineering can be applied by flexibility on the size of the modular as per the RLIC requirements. | Fixed size due to the ocean transportation and the ln - land transportation. |
No risk on delivery !
A forklift is enough !
95% building completion before delivery !